Assessment of the need for changes in parameters such as temperature, pressure or flow rate to satisfy different loading situations of the plant.
Ensuring smooth operation of boilers/turbines under normal and emergency conditions to prevent tripping of devices/units/protect equipment and personnel
Identify areas for improvement and recommend process modifications and equipment calibration to increase the operational efficiency of the machine/plant.
Handling all types of boiler and turbine emergencies including hot/cold start and shutdown. Coordination of boiler and turbine start-up and shutdown for general maintenance.
Managed a group of 20 – 40 field engineers related to operation and maintenance activities depending on the shift.
Transfer of personal technical skills, knowhow, information and experince to trainee engineers and technical personnel to improve the organisations technical knowledge base.
Handled installation, commissioning and start-up activities of 180MW axial exhaust steam turbine (type: MTD 40 CRA make: Doosan Skoda Power), air-cooled generator (type: Gen5- 100A-2P, make: Siemens) and its auxiliary systems.
Provided support during cold and hot commissioning of the steam turbine and its auxiliaries such as: lube oil system, jacking oil system, HP hydraulic system, rotary gear, gland steam system, condenser vacuum exhaust, turbine drain system, HP and LP bypass stations.
Assited senior project engineer in installation of TG Integral Piping such as lube oil,control oil, seal steam,gland steam,generator cooling water inlet and outlet and turbine drain valves piping.
Installation and alignment of static equipment such as high pressure heater, low pressure heater, air vent, stuffing box steam condenser, drain cooler, steam jet air ejector, metering slide, plate heat exchanger, atmospheric, high pressure and low pressure expansion tanks, lubricating oil equipment such as main oil tank, turbine oil cooler, duplex filter, oil centrifuge, auxiliary oil pump, jacking oil pump, emergency oil pump.
Determined and scheduled priorities as required to progress engineering work.
Completed daily construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
Evaluated change order requests in response to out-of-scope work activities and developing field conditions.
Liaised with company executives and project managers to acquire resources to move projects forward.
Controlled engineering activities to maintain work standards, adhere to timelines and meet quality assurance targets.
Assessment of the need for changes in parameters such as temperature, pressure or flow rate to satisfy different loading situations of the plant.
Ensuring smooth operation of boilers/turbines under normal and emergency conditions to prevent tripping of devices/units/protect equipment and personnel
Identify areas for improvement and recommend process modifications and equipment calibration to increase the operational efficiency of the machine/plant.
Handling all types of boiler and turbine emergencies including hot/cold start and shutdown. Coordination of boiler and turbine start-up and shutdown for general maintenance.
Managed a group of 20 – 40 field engineers related to operation and maintenance activities depending on the shift.
Transfer of personal technical skills, knowhow, information and experince to trainee engineers and technical personnel to improve the organisations technical knowledge base.
Handled installation, commissioning and start-up activities of 180MW axial exhaust steam turbine (type: MTD 40 CRA make: Doosan Skoda Power), air-cooled generator (type: Gen5- 100A-2P, make: Siemens) and its auxiliary systems.
Provided support during cold and hot commissioning of the steam turbine and its auxiliaries such as: lube oil system, jacking oil system, HP hydraulic system, rotary gear, gland steam system, condenser vacuum exhaust, turbine drain system, HP and LP bypass stations.
Assited senior project engineer in installation of TG Integral Piping such as lube oil,control oil, seal steam,gland steam,generator cooling water inlet and outlet and turbine drain valves piping.
Installation and alignment of static equipment such as high pressure heater, low pressure heater, air vent, stuffing box steam condenser, drain cooler, steam jet air ejector, metering slide, plate heat exchanger, atmospheric, high pressure and low pressure expansion tanks, lubricating oil equipment such as main oil tank, turbine oil cooler, duplex filter, oil centrifuge, auxiliary oil pump, jacking oil pump, emergency oil pump.
Determined and scheduled priorities as required to progress engineering work.
Completed daily construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
Evaluated change order requests in response to out-of-scope work activities and developing field conditions.
Liaised with company executives and project managers to acquire resources to move projects forward.
Controlled engineering activities to maintain work standards, adhere to timelines and meet quality assurance targets.