03/2022 - today
Mechanical engineering
Team lead for complex assembly and production planning at STADLER Rail Berlin
description:
Solution design and implementation on SAP S4/HANA
Focus on PP, PS, PMMO, PEO and PLM interfaces
Customizing for version management in BOM and routing, work center, WBS structure and networks.
Complex assembly with WBS elements and networks based on MBOM structure out of SIEMENS Team center.
Shop floor management with PEO production orders including interface to MES system BESICOMM.
Purchasing optimization by usage of PMMO based on selected MRP WBS elements.
Data migration for Production master data from INFOR to S4.
10/2021 - today
Fashion Industry
Team lead for Purchasing
description:
Solution design and implementation on SAP S4/HANA
Focus on MM and Interfaces
Purchasing process set up and customizing for purchase orders, MRP run and integration to EWM.
Design and technical specification for interfaces to supplier portal and label printing system.
Design and technical specification for rough capacity planning and optimized purchasing on color level.
Data migration for INTEX to S4.
08/2018 - 06/2022
Mechanical engineering
Team lead for production, assembly and planning TGW Group AT
description:
Solution design and implementation on SAP S4/HANA
Focus on PP, PS, PDM and LO-VC
Master data design and customizing for material master, material variants, BOM, routing, work centers and networks.
Discrete production with production orders including interface to external planning tool WAY.
Assembly with network orders including interface to external planning tool WAY
Product cost planning and order cost controlling.
Interface from and to legacy system for variant configuration BUDGET.
Data migration for Microsoft Navision.
01/2021 - today
Agriculture products
Senior consultant for PP at Dehner AG Rain am Lech
description:
Solution design and implementation S4 HANA
Focus on PP with external MES System Hydra
System setup and implementation for BOM routing and work centres.
Specify interface between Hydra and SAP.
System setup and implementation for MRP and long term planning.
Support and improvement for SAP PP after go live.
08/2018 - 2019
Mechanical engineering
Senior consultant for LO VC at Jungheinrich AG Hamburg
description:
Redesign and extension for various VC models
Focus on LO VC
Redesign in VC dependencies.
BOM related procedures.
Pricing procedures.
Interface related procedures.
01/2018 - 01/2019
Chemicals and Pharma
Senior Consultant HELM AG Hamburg
description:
Solution design and implementation on SAP S4/HANA
Focus on PP-PI and MM
Master data design and customizing for material master, BOM, master recipe and resources.
Multi level subcontracting with process orders and stock transfer. Inhouse production for liquids and all kind of repacking.
MRP run incl. special procurement strategies.
ATP check for planned orders and process orders.
Process orders including subcontracting and integration to external WM system for material provision and goods receipt.
Product cost planning and order cost controlling.
Make to order for special markets.
Project related production and subcontracting.
01/2018 - 05/2019
Fashion Business
Senior Consultant ESCADA Munich
description:
Business application international support for SAP IS-AFS.
Focus on SAP IS-AFS, AFS-PP, AFS-MM
Application support for;
Master data design and customizing for material master and BOM, including Interface from PDM to SAP ERP AFS. Design for reference routing and operational routing incl. work center for capacity planning purposes
Midterm seasonal planning based on capacity available for subcontracting partners. Planning via work center hierarchies for production groups.
Deployment of production quantities with tabular planning table.
MRP run incl. category structure and coverage strategies.
ATP check for planned orders and production orders.
Production orders including subcontracting and integration to external WM system for material provision and goods receipt.
Product cost planning and order cost controlling.
Make to order for US markets.
01/2017 - 08/2017 Automotive
SCHAEFFLER Group Automotive
Projektbeschreibung:
SAP RollOut Vietnam
Teilprojektleitung Produktion und Produktionslogistik
SAP Schwerpunk PP, MM, WM
Analyse und Validierung des bestehenden SAP Templates für SCHAEFFLER Automotive weltweit.
Prozessoptimierung und Harmonisierung mit Qualifizierung der Mitarbeiter.
Vorbereitung Cut over und roll out Planung.
04/2016 - 12/2016 Automotive
SCHAEFFLER Group Automotive
Projektbeschreibung:
SAP RollOut Portugal
Teilprojektleitung Produktion und Produktionslogistik
SAP Schwerpunk PP, MM, WM
Analyse und Validierung des bestehenden SAP Templates für SCHAEFFLER Automotive weltweit.
Prozessoptimierung und Harmonisierung mit Qualifizierung der Mitarbeiter.
Vorbereitung Cut over und roll out Planung.
09/2014 - 03/2016
HENKEL Adhesives
Projektbeschreibung:
SAP Change Management Toll-Manufacturing
Fachliche Schwerpunkte in SAP sind PP-PI, MM, QM, PS und PM.
Analyse und Validierung des bestehenden SAP Templates für 6 deutsche Klebstoffwerke. Prozessoptimierung und Harmonisierung mit Qualifizierung der Mitarbeiter.
Vorbereitung Cut over und roll out Planung.
12/2013- heute Maschinenbau
Netzsch Pumpen & Systeme
Projektbeschreibung:
Konzeption und Umsetzung Variantenmodell für die Pumpenfertigung in Waldkraiburg.
Fachliche Schwerpunkte in SAP LO-VC und Integration PP/SD/MM.
Design und Modellierung für Stücklisten und Arbeitspläne. Aufbau und Ablage des Beziehungswissens. Spezifikation von Erweiterungen im Beziehungswissen.
Verteilung des Modells in verschiedene Systeme.
02/2013- 04/2014 Holzindustrie
METSÄ Group Metsä Wood Helsinki
Projektbeschreibung:
Teilprojektleitung, Implementation, Testplanung, Cut Over und Roll Out in verschiedene europäische Werke in Finnland, England, Frankreich und Deutschland.
Team lead Produktion mit 6 Beratern. Fachliche Schwerpunkte in SAP LO-VC und Integration PP und SD.
Aufbau und Einführung Stücklisten und Arbeitspläne mit Beziehungswissen. Einführung Fertigungsplanung und ?steuerung. Einführung Kapazitätsplanung. Integration zu SD, CO und PM. Einführung Erweiterungen zu SAP IS-MILL.
ALE Verteilung der Modelle in verschiedene SAP Systeme.
Senior Consultant
06/2011 - heute KSB AG Frankenthal, Maschinenbau
03/2022 - today
Mechanical engineering
Team lead for complex assembly and production planning at STADLER Rail Berlin
description:
Solution design and implementation on SAP S4/HANA
Focus on PP, PS, PMMO, PEO and PLM interfaces
Customizing for version management in BOM and routing, work center, WBS structure and networks.
Complex assembly with WBS elements and networks based on MBOM structure out of SIEMENS Team center.
Shop floor management with PEO production orders including interface to MES system BESICOMM.
Purchasing optimization by usage of PMMO based on selected MRP WBS elements.
Data migration for Production master data from INFOR to S4.
10/2021 - today
Fashion Industry
Team lead for Purchasing
description:
Solution design and implementation on SAP S4/HANA
Focus on MM and Interfaces
Purchasing process set up and customizing for purchase orders, MRP run and integration to EWM.
Design and technical specification for interfaces to supplier portal and label printing system.
Design and technical specification for rough capacity planning and optimized purchasing on color level.
Data migration for INTEX to S4.
08/2018 - 06/2022
Mechanical engineering
Team lead for production, assembly and planning TGW Group AT
description:
Solution design and implementation on SAP S4/HANA
Focus on PP, PS, PDM and LO-VC
Master data design and customizing for material master, material variants, BOM, routing, work centers and networks.
Discrete production with production orders including interface to external planning tool WAY.
Assembly with network orders including interface to external planning tool WAY
Product cost planning and order cost controlling.
Interface from and to legacy system for variant configuration BUDGET.
Data migration for Microsoft Navision.
01/2021 - today
Agriculture products
Senior consultant for PP at Dehner AG Rain am Lech
description:
Solution design and implementation S4 HANA
Focus on PP with external MES System Hydra
System setup and implementation for BOM routing and work centres.
Specify interface between Hydra and SAP.
System setup and implementation for MRP and long term planning.
Support and improvement for SAP PP after go live.
08/2018 - 2019
Mechanical engineering
Senior consultant for LO VC at Jungheinrich AG Hamburg
description:
Redesign and extension for various VC models
Focus on LO VC
Redesign in VC dependencies.
BOM related procedures.
Pricing procedures.
Interface related procedures.
01/2018 - 01/2019
Chemicals and Pharma
Senior Consultant HELM AG Hamburg
description:
Solution design and implementation on SAP S4/HANA
Focus on PP-PI and MM
Master data design and customizing for material master, BOM, master recipe and resources.
Multi level subcontracting with process orders and stock transfer. Inhouse production for liquids and all kind of repacking.
MRP run incl. special procurement strategies.
ATP check for planned orders and process orders.
Process orders including subcontracting and integration to external WM system for material provision and goods receipt.
Product cost planning and order cost controlling.
Make to order for special markets.
Project related production and subcontracting.
01/2018 - 05/2019
Fashion Business
Senior Consultant ESCADA Munich
description:
Business application international support for SAP IS-AFS.
Focus on SAP IS-AFS, AFS-PP, AFS-MM
Application support for;
Master data design and customizing for material master and BOM, including Interface from PDM to SAP ERP AFS. Design for reference routing and operational routing incl. work center for capacity planning purposes
Midterm seasonal planning based on capacity available for subcontracting partners. Planning via work center hierarchies for production groups.
Deployment of production quantities with tabular planning table.
MRP run incl. category structure and coverage strategies.
ATP check for planned orders and production orders.
Production orders including subcontracting and integration to external WM system for material provision and goods receipt.
Product cost planning and order cost controlling.
Make to order for US markets.
01/2017 - 08/2017 Automotive
SCHAEFFLER Group Automotive
Projektbeschreibung:
SAP RollOut Vietnam
Teilprojektleitung Produktion und Produktionslogistik
SAP Schwerpunk PP, MM, WM
Analyse und Validierung des bestehenden SAP Templates für SCHAEFFLER Automotive weltweit.
Prozessoptimierung und Harmonisierung mit Qualifizierung der Mitarbeiter.
Vorbereitung Cut over und roll out Planung.
04/2016 - 12/2016 Automotive
SCHAEFFLER Group Automotive
Projektbeschreibung:
SAP RollOut Portugal
Teilprojektleitung Produktion und Produktionslogistik
SAP Schwerpunk PP, MM, WM
Analyse und Validierung des bestehenden SAP Templates für SCHAEFFLER Automotive weltweit.
Prozessoptimierung und Harmonisierung mit Qualifizierung der Mitarbeiter.
Vorbereitung Cut over und roll out Planung.
09/2014 - 03/2016
HENKEL Adhesives
Projektbeschreibung:
SAP Change Management Toll-Manufacturing
Fachliche Schwerpunkte in SAP sind PP-PI, MM, QM, PS und PM.
Analyse und Validierung des bestehenden SAP Templates für 6 deutsche Klebstoffwerke. Prozessoptimierung und Harmonisierung mit Qualifizierung der Mitarbeiter.
Vorbereitung Cut over und roll out Planung.
12/2013- heute Maschinenbau
Netzsch Pumpen & Systeme
Projektbeschreibung:
Konzeption und Umsetzung Variantenmodell für die Pumpenfertigung in Waldkraiburg.
Fachliche Schwerpunkte in SAP LO-VC und Integration PP/SD/MM.
Design und Modellierung für Stücklisten und Arbeitspläne. Aufbau und Ablage des Beziehungswissens. Spezifikation von Erweiterungen im Beziehungswissen.
Verteilung des Modells in verschiedene Systeme.
02/2013- 04/2014 Holzindustrie
METSÄ Group Metsä Wood Helsinki
Projektbeschreibung:
Teilprojektleitung, Implementation, Testplanung, Cut Over und Roll Out in verschiedene europäische Werke in Finnland, England, Frankreich und Deutschland.
Team lead Produktion mit 6 Beratern. Fachliche Schwerpunkte in SAP LO-VC und Integration PP und SD.
Aufbau und Einführung Stücklisten und Arbeitspläne mit Beziehungswissen. Einführung Fertigungsplanung und ?steuerung. Einführung Kapazitätsplanung. Integration zu SD, CO und PM. Einführung Erweiterungen zu SAP IS-MILL.
ALE Verteilung der Modelle in verschiedene SAP Systeme.
Senior Consultant
06/2011 - heute KSB AG Frankenthal, Maschinenbau